Altus Space Builder Mullanpur New Chandigarh Plots.
CONSTRUCTION LINKED Payment Plan
projects included Housing Township consisting of plots/villas/group & housing & at village Salamtpur, Dhode Majra, Rasulpur and Saini Majra in Mullanpur Planning area of GMADA over an area of 170 acre at a cost of Rs 350 crore to be developed as Joint venture by Greater Punjab Officer Cooperative House Building Society Ltd and Altus Space Builders Pvt Ltd. Now the company has got CLU for 381 acre.
Plots Size 250 , 350 , 500 , 1000 Sq. Yd.
Launching Residential Apartment Size is 1490 Sq Ft
3 BHK Dining/Living Room 3 Washrooms Kitchenette
Basic Sale Price: Rs.2885/sq.ft
Basic Sale Price + Applicable EDC.
The allotment of apartment unit numbers will be done through public draw system with prior intimation to the vested clients.
Launching Residential Apartment Size is 1490 Sq Ft
3 BHK Dining/Living Room 3 Washrooms Kitchenette
Basic Sale Price: Rs.2885/sq.ft
Basic Sale Price + Applicable EDC.
The allotment of apartment unit numbers will be done through public draw system with prior intimation to the vested clients.
Technical Specifications:
Structure:
Earthquake resistant R.C.C framed structure
Living , Dining, Lobby & Passage :
Flooring : Vitrified /Ceramic Tiles
Walls : Acrylic Emulsion
Ceiling : Oil bound Distemper
Bedrooms :
Flooring : Master Bedroom—Wooden Flooring
Other Bedrooms --- Vitrified /Ceramic Tiles
Walls : Acrylic Emulsion
Ceiling : Oil bound Distemper
Kitchen :
Flooring : Anti skid Ceramic tiles, Counters in
Marble/Granite
Walls : Combination of Ceramic tiles (upto 2’0”
above counter) & Oil bound Distemper
Ceiling : Oil bound Distemper
Toilets :
Flooring : Anti skid Ceramic tiles
Walls : Combination of Ceramic tiles, Oil bound Distemper
Ceiling : Oil bound Distemper
Balcony :
Flooring : Terrazzo tiles/ Ceramic tiles
Walls : Paint as per external finish
Doors & Windows :
• Internal doors polished/painted frames made of hardwood &
painted flush shutters/ moulded skin doors.
• Entrance door-Teak veneered & polished shutter/moulded skin door.
• External glazings are powder coated aluminum .
Kitchen Fittings :
Stainless steel bowl ,Sink Mixer.
Toilet Fittings :
CP fittings ,White Chinaware
Electrical Fittings :
Modular type switches & sockets ,copper wiring
(fittings like fans ,light fixtures ,geysers ,appliances
…….etc not provided).
Security System :
CCTV for podium parking and entrance lobby at GF
Elevator/Lifts :
Automatic passenger lifts.
Payment Plans
POSSESSION Linked Payment Plan
At the time of Booking
|
Rs. 3,00,000
|
On 90 Days of Booking
|
50 % of payments
(50% of BSP + PLC if applicable)
Less booking amount
|
At the time of Possession
|
Balance BSP + 100% of Additional cost + IFMS + Stamp duty / registration + taxes + applicable EDC + other cost (if any)
|
FLEXI Payment Plan
At the time of Booking
|
Rs. 3,00,000
|
On 90 Days of Booking
|
15 % of BSP, Less booking amount
|
Within 5 month of Booking
|
7 % of BSP
|
Within 7 month of Booking
|
7 % of BSP
|
Within 9 month of Booking
|
7 % of BSP
|
Within 11 month of Booking
|
7 % of BSP
|
Within 13 month of Booking
|
7 % of BSP
|
Within 15 month of Booking
|
7 % of BSP
|
Within 17 month of Booking
|
6 % of BSP
|
Within 19 month of Booking
|
6 % of BSP
|
Within 21 month of Booking
|
6 % of BSP
|
Within 23 month of Booking
|
6 % of BSP
|
Within 25 month of Booking
|
6 % of BSP
|
Within 27 month of Booking
|
6 % of BSP
|
Within 29 month of Booking
|
6 % of BSP
|
At the time of Possession
|
Balance BSP + 100% of Additional cost + IFMS + Stamp duty / registration + taxes + applicable EDC + other cost (if any)
|
At the time of Booking
|
Rs. 3,00,000
|
On 90 Days of Booking
|
20 % of BSP, Less booking amount
|
On start of Construction
|
7.5 % of BSP
|
On Casting of Basement Roof
|
7.5 % of BSP
|
On Casting of 1st Floor Roof
|
7.5 % of BSP
|
On Casting of 2nd Floor Roof
|
7.5 % of BSP
|
On Casting of 3rd Floor Roof
|
7.5 % of BSP
|
On Casting of 5th Floor Roof
|
7.5 % of BSP + 50% PLC (if applicable)
|
On Casting of 8th Floor Roof
|
7.5 % of BSP +50 % PLC (if applicable)
|
On Casting of 10th Floor Roof
|
7.5 % of BSP
|
On Completion of Final Roof Slab
|
5 % of BSP + 100 % CMRC
|
On Completion of internal plaster
|
5 % of BSP
|
On Completion of Flooring Works
|
5 % of BSP
|
At the time of Possession
|
5 % of BSP + 100% of Additional cost + IFMS + Stamp duty / registration + taxes + applicable EDC + other cost (if any)
|
BSP = Basic Sale price
PLC = Preferential Location Charges
CMRC = Club Membership Registration Charges
IFMS = Interest Free Maintenance Security
Altus Space Builders Project in Mullanpur
ALTUS SPACE BUILDERS MULLANPUR OVERVIEW
New Price
Plot Size 250 Sq.Yds.
Rs.15,000 Per Sq.Yds (4 Month Payment Plan)
Rs.16,500 Per Sq.Yds (1 Year Payment Plan)
Plot Size 350 Sq.Yds.
Rs.14,000 Per Sq.Yds (4 Month Payment Plan)
Rs.15,500 Per Sq.Yds (1 Year Payment Plan)
Plot Size 500 Sq.Yds.
Rs.14,000 Per Sq.Yds (4 Month Payment Plan)
Rs.15,500 Per Sq.Yds (1 Year Payment Plan)
Punjab empowered committee approves mega projects worth Rs.1171 crores
CHANDIGARH: The Empowered Committee today approved seven Agri-mega projects and two Housing projects with an investment of Rs.1171 crore which would generate direct and indirect employment of nearly 23,500 persons.Disclosing this here Friday a spokesperson of the Chief Minister’s Office informed that empowered committee in its meeting held under the chairmanship of Punjab Chief Minister Parkash Singh Badal approved seven Agri-mega projects viz.Rice Milling Unit of M/s. Gurdaspur Overseas Ltd. at Village Tugalwala in Gurdaspur district with an investment of Rs.35.40 crore, fully automatic rice mill and a power co-generation unit of M/s. Amir Chand Jagdish Kumar (Exports) Ltd. at Rajasansi-Anjala Road, Amritsar (Rs.50 crore), an integrated rice processing, rice godowns and biomass based power co-generation plants by M/s. Sukhbir Agro Energy Ltd. at village Jhoke Hari Har, in district Ferozepur and village Khyala Kalan in district Mansa (Rs.225 crore).An integrated vegetable processing plant to produce frozen vegetables and frozen French fries by M/s. Pagro Frozen Foods Pvt. Ltd. at village Jalvehri gehlan near village Sadhugarh in district Fatehgarh Sahib (Rs.40 crore), M/s. Pioneer Industries Ltd., for the expansion of an existing distillery unit and to set up a new power co-generation unit at industrial growth centre, Pathankot (Rs.57 crore), M/s. Jyoti Threads (India) Ltd., for setting up a cotton yarn manufacturing unit at at vllage Bamnna Samana in district Patiala(Rs.33.99 crore) and M/s. BCL Industries & Infrastructure Ltd. setting up a grain based distillery unit to manufacture potable alcohol at village Sangat Kalan Dabwali Road Bathinda Rs.90.60).Apart from these projects, the empowered committee also gave green signal to two mega housing projects worth Rs.639 crore. These projects included Housing Township consisting of plots/villas/group housing at village Salamtpur, Dhode Majra, Rasulpur and Saini Majra in Mullanpur Planning area of GMADA over an area of 170 acre at a cost of Rs.350 crore to be developed as Joint venture by Great Punjab Officer Cooperative House Building Society Ltd. andAltus Space Builders Pvt. Ltd. and a Residential Township abutting Sidhwan Canal, located in village Birmi and Bains at a distance of 6.75 KM from Nanaksar Gurdwara Chowk (at the junction of Ferozepur Highway & Southern Bypass) towards Sidhwan at Ludhiana over an area of 120 acre involving a total investment of Rs.289 crore developed by M/s Janpath Estates Pvt. Ltd.